Project description
Construction of the sterile silo support base adjacent to the headframe at the odyssey mine. Beams and columns were concreted on shoring over 12 m (40′) high. A complex shoring system was required to support the heavy loads.
Slab on shoring over 12 m high (40 ft)
Mass concrete
Over 550 m³ (19 500 ft³) of concrete